DEVRY GSCM 520 WEEK 7 CASE STUDY
IF You Want To Purchase A+ Work Then Click The Link
Below , Instant Download
Distribution Center Location-Grainger
Please address the following:
Relative to
the U.S. distribution network, calculate the costs associated with running the
existing system. Assume that 40% of the volume arrives in Seattle and 60% in
Los Angeles, and the port processing fee for federal processing at both
locations is $5.00 per CBM. Assume that everything is transferred to the Kansas
City distribution center by rail, where it is unloaded and quality checked.
Assume that all volume is then transferred by truck to the nine existing
warehouses in the United States.
No comments:
Post a Comment