Wednesday 15 July 2015

DEVRY GSCM 520 WEEK 7 CASE STUDY

IF You Want To Purchase A+ Work Then Click The Link Below  , Instant Download

If You Face Any Problem E- Mail Us At  JOHNMATE1122@Gmail.Com
Distribution Center Location-Grainger

Please address the following:

Relative to the U.S. distribution network, calculate the costs associated with running the existing system. Assume that 40% of the volume arrives in Seattle and 60% in Los Angeles, and the port processing fee for federal processing at both locations is $5.00 per CBM. Assume that everything is transferred to the Kansas City distribution center by rail, where it is unloaded and quality checked. Assume that all volume is then transferred by truck to the nine existing warehouses in the United States.


No comments:

Post a Comment